Steps (5) arrow_drop_up arrow_drop_down
Obtain plant inspection report/certificate  (5) expand_more expand_less

arrow_drop_up arrow_drop_down
Summary of the procedure

Institutions involved 3 expand_more expand_less

Occupational safety and health authority (x 2)
Customer's premise
NMB Bank

Results 1 expand_more expand_less

OSHA Inspection Report
OSHA Inspection Report

Required Documents expand_more expand_less

NMB Bank slip (x 2)
OSHA Government Receipt

Estimated cost Tanzanian Shilling  6,260,000

expand_more expand_less

USD expand_more expand_less
  • USD Add Name Here
Tanzanian Shilling 800,000
Test fees for steam boiler above 40ton/hr
Tanzanian Shilling 600,000
Test fees for steam boiler between 20 and 40 ton/hr
Tanzanian Shilling 600,000
Test fees for steam boiler between 10 and 19ton/hr
Tanzanian Shilling 400,000
Test fees steam boiler between 5 and 9ton/hr
Tanzanian Shilling 300,000
Test fees for steam boiler between 1 and 5ton/hr
Tanzanian Shilling 100,000
Test fee for steam boiler less than 1ton/hr
Tanzanian Shilling 100,000
Test fee for each hot water boiler
Tanzanian Shilling 100,000
Test fees for each economizer or each super heater
Tanzanian Shilling 100,000
Test fees for steam jacket vessel of a diameter
Tanzanian Shilling 100,000
Test fees for each steam receiver or steam jacket vessel
Tanzanian Shilling 100,000
Test fees for each air receiver of a diameter of 75 cm or above
Tanzanian Shilling 100,000
Test fee for medical sterilizer boiler
Tanzanian Shilling 50,000
Test fees for each steam tube oven
Tanzanian Shilling 100,000
Test fees for any other pressurized vessel tanks
Tanzanian Shilling 200,000
Test fee for steam boiler above 40 ton/hr
Tanzanian Shilling 200,000
Test fees for steam boiler between 20 and 40 ton/hr
Tanzanian Shilling 100,000
Test fees for steam boiler between 10 and 19 ton/hr
Tanzanian Shilling 100,000
Test fees steam boiler between 5 and 9 ton/hr
Tanzanian Shilling 125,000
Test fees for steam boiler between 1 and 5 ton/hr
Tanzanian Shilling 80,000
Test fees for steam boiler less than 1 ton/hr
Tanzanian Shilling 100,000
Test fees for each hot water boiler
Tanzanian Shilling 80,000
Test fees for each economizer or each super heater
Tanzanian Shilling 50,000
Test fees for steam jacket vessel of a diameter
Tanzanian Shilling 50,000
Test fees for each steam receiver or steam jacket vessel of a diameter less than 60cmsteam heater, header, exchanger
Tanzanian Shilling 50,000
Test fees for each air receiver of a diameter of 75cm or cover
Tanzanian Shilling 50,000
Test fees for each air receiver of a diameter less than 75cm
Tanzanian Shilling 50,000
Test fees for each medical sterilizing boiler autoclave of less than 60cm in diameter
Tanzanian Shilling 50,000
Test fees for each steam tube oven
Tanzanian Shilling 50,000
Test fees for any other pressurised vessel Tanks
Tanzanian Shilling 200,000
Test fees for steam boiler above 40ton/hr
Tanzanian Shilling 200,000
Test fees for steam boiler between 20 and 40 ton/hr
Tanzanian Shilling 100,000
Test fees for steam boiler between 10 and 19ton/hr
Tanzanian Shilling 100,000
Test fees steam boiler between 5 and 9ton/hr
Tanzanian Shilling 125,000
Test fees for steam boiler between 1 and 5ton/hr
Tanzanian Shilling 120,000
Test fee for steam boiler less than 1ton/hr
Tanzanian Shilling 100,000
Test fee for each hot water boiler
Tanzanian Shilling 80,000
Test fees for each economizer or each super heater
Tanzanian Shilling 50,000
Tanzanian Shilling 50,000
Test fees for steam jacket vessel of a diameter
Tanzanian Shilling 50,000
Test fees for each steam receiver or steam jacket vessel
Tanzanian Shilling 50,000
Test fees for each air receiver of a diameter of 75 cm or above
Tanzanian Shilling 50,000
Test fee for medical sterilizer boiler
Tanzanian Shilling 50,000
Test fees for each steam tube oven
Tanzanian Shilling 50,000
Test fees for any other pressurized vessel tanks

Total Duration 2 d - 19 d expand_more expand_less

  min max
Total time (sum): 2 d 19 d
of which:
Waiting time in queue (sum): 0mn 20mn
Attention at counter: 5mn 25mn
Waiting time until next step (sum): 2 d 18 d

Laws 2 expand_more expand_less

OSHA ACT 2003 OSHA ACT no. 5 of 2003
  articles 42, S. 6
OSHA General Administrative (Amendmend) Rules 2018 OSHA General Administrative (Amendmend) Rules 2018
  Article First schedule
Powered by eRegulations ©, a content management system developed by UNCTAD's Business Facilitation Program and licensed under Creative Commons License